However if the nail needs another half inch to seat in the proper location it should be removed.
Which side do you nail hardwood flooring.
How do you continue when you have to nail the male side.
I am having a hardwood floor installed on my first floor which is a u shape.
Some guys actually use the side of a big screwdriver to get it home.
The correct way to install hardwood flooring planks begins by positioning the first plank in one corner of your room along the longest wall and perpendicular to the floor joists.
Not sure why you have to nail it that way but i would pre drill the bottom edge of the groove side and nail.
If you re handling any installation specifically a prefinished floor check the plate on the underside of the fastener.
Suggestions for the installation of solid hardwood flooring and they assume be taken at this time to remove or repair particular characteristics you do not desire.
Which method you choose mainly depends upon your subfloor.
Even though it s generally made of vinyl nylon anything embedded in the bottom will scratch the floor.
As you get to the last leg of the u you have a female end.
With either tool you can drive a nail at a.
If you choose to fix your hardwood floor into position you then have the choice of either gluing your floor to the subfloor using flexible flooring adhesive to create a full surface bond or you can secretly nail your floor directly to the subfloor.
Check this video out to get started and be sure to check out the amazing prices an.
Wanting to go the diy route and install hardwood floors in your own home.
Follow all the manufacturer s instructions when using the power nailer or stapler and continue to nail staple the tongue side of each board at a 45 degree angle and at 8 intervals but do not nail staple within 2 from the end of each board.
On the tongue side in the angle formed by the tongue and the higher part of the board to finish forcing the groove onto the prior tongue.
By chris deziel if you re installing a hardwood floor you ll probably use either a flooring nailer or a nail gun to affix the boards to the subfloor.
A bit of adhesive might be a good idea too.
The back edge groove side and top nail the board into place using 7d or 8d.
The groove of the plank should face the wall and the tongue should face outward.